For the installation of the single-phase distribution board, the following components were used for each circuit:


✔ Shower outlet: 50A circuit breaker and 10 mm phase, neutral and earth cable;

✔ Kitchen outlets: 25A circuit breaker and 4 mm phase, neutral and earth cable;

✔ Bedroom and living room sockets: 20A circuit breaker and 2.5 mm phase, neutral and ground cable;

✔ Lighting: 10A circuit breaker and 1.5 mm phase and neutral cable.


According to item 6.3.5.2.9 of NBR-5410, the SPD can be installed with a conductor with a minimum section of 4mm.

According to figure 13 of NBR-5410 when the neutral conductor is grounded BEP (main equipotential bus) there is no need to install SPD for the neutral conductor.


 How to Install Single Phase 220V Panel with Grounding TNC-S

For the installation of the single-phase distribution board, the following components were used for each circuit:


✔ Shower outlet: 50A circuit breaker and 10 mm phase, neutral and earth cable;

✔ Kitchen outlets: 25A circuit breaker and 4 mm phase, neutral and earth cable;

✔ Bedroom and living room sockets: 20A circuit breaker and 2.5 mm phase, neutral and ground cable;

✔ Lighting: 10A circuit breaker and 1.5 mm phase and neutral cable.


According to item 6.3.5.2.9 of NBR-5410, the SPD can be installed with a conductor with a minimum section of 4mm.

According to figure 13 of NBR-5410 when the neutral conductor is grounded BEP (main equipotential bus) there is no need to install SPD for the neutral conductor.