A two-phase 127/220V switchgear on a TN-S grounding system has two phases, each with a nominal voltage of 127V with respect to neutral. The voltage between phases is 220V.


In the TN-S system, the neutral is grounded separately, usually via a grounding rod, while the phases are kept isolated from earth. This provides greater safety and reduces the risk of electric shock.

/*!

THE LARGEST ONLINE ELECTRICAL SCHOOL IN BRAZIL – COMPLETE COURSES WITH VALID CERTIFICATE, LIVE ONLINE TECHNICAL SUPPORT, PRACTICAL AND THEORETICAL CLASSES STEP BY STEP (ALL COURSES UPDATE 2022).

For the installation of the single-phase distribution board, the following components were used for each circuit:


✔ Shower outlet: 50A circuit breaker and 10 mm phase, neutral and earth cable;

✔ Kitchen outlets: 25A circuit breaker and 4 mm phase, neutral and earth cable;

✔ Bedroom and living room sockets: 20A circuit breaker and 2.5 mm phase, neutral and ground cable;

✔ Lighting: 10A circuit breaker and 1.5 mm phase and neutral cable.


According to item 6.3.5.2.9 of NBR-5410, the SPD can be installed with a conductor with a minimum section of 4mm.

According to figure 13 of NBR-5410 when the neutral conductor is grounded BEP (main equipotential bus) there is no need to install SPD for the neutral conductor


 How to Install 220V Panel Complete with TN-S Grounding

A two-phase 127/220V switchgear on a TN-S grounding system has two phases, each with a nominal voltage of 127V with respect to neutral. The voltage between phases is 220V.


In the TN-S system, the neutral is grounded separately, usually via a grounding rod, while the phases are kept isolated from earth. This provides greater safety and reduces the risk of electric shock.

/*!

THE LARGEST ONLINE ELECTRICAL SCHOOL IN BRAZIL – COMPLETE COURSES WITH VALID CERTIFICATE, LIVE ONLINE TECHNICAL SUPPORT, PRACTICAL AND THEORETICAL CLASSES STEP BY STEP (ALL COURSES UPDATE 2022).

For the installation of the single-phase distribution board, the following components were used for each circuit:


✔ Shower outlet: 50A circuit breaker and 10 mm phase, neutral and earth cable;

✔ Kitchen outlets: 25A circuit breaker and 4 mm phase, neutral and earth cable;

✔ Bedroom and living room sockets: 20A circuit breaker and 2.5 mm phase, neutral and ground cable;

✔ Lighting: 10A circuit breaker and 1.5 mm phase and neutral cable.


According to item 6.3.5.2.9 of NBR-5410, the SPD can be installed with a conductor with a minimum section of 4mm.

According to figure 13 of NBR-5410 when the neutral conductor is grounded BEP (main equipotential bus) there is no need to install SPD for the neutral conductor