Post Top Ad

Friday, March 24, 2023

on video Modified sine wave inverter 12v to 220v


 One main 230VAC Outlet. Interactive setup mode: Output Voltage, RCD Test, Last Error Code, Battery Size, Power Saving, Low Voltage Cut-off, and Output Frequency.


Description

LCD display frame with 6m cable.

RCD Test is to test the earth leakage protection function is working correctly. Several Indicator & Error modes shown on the LCD Display. Feature one USB and Comms port. NMSW Inverter's SLEEP MODE will activate in 10 min without any input while turning on. MOQ is 50-500PCS, production time 60 days.


LCD Display Panel Guide:

Switching On

1. Ensure that the inverter power on/off switch is in the OFF (0) position.

2. Connect source battery’s positive and negative leads by using the provided clamps with the unit’s terminals, make sure the polarities are accurate.

3. Plug the appliance into the AC output socket on the inverter, ensuring it does not exceed the maximum output power of the inverter.

4. Turn the power on/off switch to the ON (I) position.

5. The Power indicator will illuminate green and mains power will be available from the AC output plugs(s). On models fitted with a display the LCD screen will also illuminate.

Current Sensor Installation (optional):

To enable monitoring of the input current and hours remaining function, hours remaing function is an estimate of time remaining before the battery will be depleted based on the current load. The optional current sensor can should be fitted as shown in the figure.


 One main 230VAC Outlet. Interactive setup mode: Output Voltage, RCD Test, Last Error Code, Battery Size, Power Saving, Low Voltage Cut-off, and Output Frequency.


Description

LCD display frame with 6m cable.

RCD Test is to test the earth leakage protection function is working correctly. Several Indicator & Error modes shown on the LCD Display. Feature one USB and Comms port. NMSW Inverter's SLEEP MODE will activate in 10 min without any input while turning on. MOQ is 50-500PCS, production time 60 days.


LCD Display Panel Guide:

Switching On

1. Ensure that the inverter power on/off switch is in the OFF (0) position.

2. Connect source battery’s positive and negative leads by using the provided clamps with the unit’s terminals, make sure the polarities are accurate.

3. Plug the appliance into the AC output socket on the inverter, ensuring it does not exceed the maximum output power of the inverter.

4. Turn the power on/off switch to the ON (I) position.

5. The Power indicator will illuminate green and mains power will be available from the AC output plugs(s). On models fitted with a display the LCD screen will also illuminate.

Current Sensor Installation (optional):

To enable monitoring of the input current and hours remaining function, hours remaing function is an estimate of time remaining before the battery will be depleted based on the current load. The optional current sensor can should be fitted as shown in the figure.

No comments:

Post a Comment

Post Top Ad

Pages